Operating precautions for the water drop type feed hammer mill
- Sep 17, 2018 -

When testing the water drop type feed hammer mill, the equipment should be installed first and then run at no load. Before testing the machine, check whether there are any tools and other things on the machine. Add appropriate lubricant to each lubrication part and ensure that the fastening parts are tightened. At the same time, the adjustment of the feed roller is adjusted appropriately.

 

Under normal conditions, the temperature rise of each bearing does not exceed 650 ° C after 2 h of no-load operation of the water-drop type feed hammer mill. Then you can enter the production operation. The hammer mill should first add suitable lubricant to each lubrication part during the granulation operation. During the operation of the equipment, the speed at which the feed roller bites into the rubber must be synchronized with the feed speed. If it is found that the feed roller has a broken piece or a deposited film, the roll of the feed roller should be stopped immediately.

 

It should be noted that in the granulation process of the water drop type feed hammer mill, if it is found that the machine has obvious abnormal noise or vibration, it should be stopped immediately. When the granulation operation is completed, the water-drop type feed hammer mill should be timely and cleaned.